ABU SARA GOLD MINE

DELGO MINING adopted a vision of Zero Harm, created comprehensive Health, Safety and Sustainability frameworks. We diligently work to support our initiatives at all levels of the organization. Our efforts throughout 2011 continue to yield results as we maintain our focus on doing the right things to protect our people from harm.

ABU SARA GOLD MINE             2019

OPERATIONS & PROJECTS

Exploration & Development

Delgo’s current mining lease area is 22 km² within Block 17. 362 Diamond Drill holes with the total length of 36,347 meters have been performed in Abu Sara Gold Mine area, as of September 2018. The potential of the Abu Sara area is around 2.5 million oz. gold under the light of current drilling and geological information. Mineralization is structurally controlled mesothermal, shear zone hosted gold deposit. Mineralization is associated with intense sericite – carbonate alteration, quartz veining (1mm scale to a maximum of 22 m) throughout Abu Sara.

2019             DELGO MINING

OPERATIONS & PROJECTS

Open Pit

The mine department will be striving to combine the most modern technology available in geology, mine engineering, mine supervision and production to provide DML the most efficient, economical and safest mining operation possible.

ABU SARA GOLD MINE             2019

OPERATIONS & PROJECTS

Underground Operations

Due to the recent research, geology and structure of the Abu South Zone had been examined and decided that an underground mining operation would be suitable to increase gold grade and gold production.

2019             DELGO MINING

OPERATIONS & PROJECTS

Mineral Processing Operations

Abu Sara Gold Mine mineral processing unit has 6 unit operations. The throughput of the processing unit is 360,000 tons per year. The company carried its process further by investing in a CIL plant with approximately 500,000 tons annual capacity in order to improve its operational efficiency.

ABU SARA GOLD MINE             2019

OPERATIONS & PROJECTS

Laboratory

Chemistry laboratory provides qualitative and quantitative analysis of metals in ores using pyro metallurgical methods and gravimetric analysis. The techniques are applied for precious metals such as gold. Chemical analysis of gold using both wet and dry methods. Our monthly capacity is 5000 analysis.